Dubai Handover Checklist: What to Check Before You Sign

By KeyDay · Published 18/09/2026 · Updated 29/09/2026 · 9 min read

Checklists

9 min read

Key takeaways

  • Go with electricity, water and cooling connected. Without them, most systems cannot be tested.
  • Test, do not just look: run every tap, flush every toilet, try every socket and pour water where it should drain.
  • Record every snag the same way, with a reference, room, precise location and photo, in one list.
  • Documents and keys matter as much as finishes: the snag list attached to the certificate, keys and cards counted, meters photographed.
  • Hidden leaks, insulation gaps and some electrical faults need instruments. That is where a professional inspection adds most.

Before you accept a new home in Dubai, check every room, test every system and match the paperwork against your sale and purchase agreement (SPA). The checklist below runs from the front door to the documents and keys, and is written so you can use it yourself. Where a DIY check reaches its limits, we say so.

Before you go

Arrange

  • An appointment in writing. Ask the developer's handover team for an inspection slot and confirm who will let you in.
  • Utilities on. Owners apply to DEWA (opens in a new tab) online or in its app with the title deed or SPA and a passport image or Emirates ID number; owners do not need an Ejari. The security deposit is AED 2,000 for a flat and AED 4,000 for a villa, refunded to owners when the property is sold, and DEWA connects supply within 15 working hours of payment. District cooling, where your building uses it, may need a separate registration with the cooling provider.
  • Your papers. The handover notice, the SPA floor plan and the page that states the unit's area.

Bring

  • A torch: a low beam along a wall shows uneven paint and plaster
  • A plug-in socket tester for UK-type three-pin sockets, the type used in the UAE
  • A spirit level and a tape measure or laser measure
  • A jug or bucket of water for drainage tests
  • Low-tack tape or sticky notes to mark each snag
  • A charged phone for photos
  • Time: allow 2 to 3 hours for an apartment, more for a house

Record each snag the same way

Number snags by room so you can refer to them in emails and on the handover certificate. One line per snag:

RefWhereWhat is wrongPhoto
LIV-01Living room, wall behind the TV pointPatchy paint, roller marks visibleIMG_0412
BTH-03Main bathroom, shower floor by the drainWater pools; the floor falls away from the drainIMG_0431

The room-by-room checklist

Entrance and corridor

  • The main door opens, closes and latches without force, and every key works the lock.
  • If a door closer is fitted, it shuts the door fully without slamming.
  • The door viewer or video intercom and the doorbell work.
  • Floor tiles at the threshold are level, unchipped and fully grouted.
  • Lights, switches and cupboard doors in the corridor work and sit straight.

Living and dining areas

  • Walls and ceilings: cracks, patchy paint, marks and stains. A stain on a ceiling can indicate a leak above.
  • Floors: tap tiles with a knuckle or a coin. A hollow sound suggests a void beneath. Look for cracked or chipped tiles, uneven edges and gaps in the grout.
  • Skirting: fixed firmly, sealed, with neat corners.
  • Sockets, switches, TV and data points: covers straight and undamaged, and each one works.
  • Windows and sliding doors: open, close and lock smoothly; seals intact; glass free of scratches and chips.

Kitchen

  • Cabinet doors aligned, hinges adjusted, soft-close working; drawers run smoothly.
  • Worktop joints tight, edges unchipped, sealant continuous along the wall.
  • The sink: hot and cold at the tap, good flow, and no drips underneath while it runs and drains.
  • Every appliance switched on and run: hob, oven, extractor, fridge, dishwasher and washing machine where supplied.
  • Splashback tiles and grout complete; sockets near the sink undamaged.

Bedrooms and wardrobes

  • Doors, handles and locks work; wardrobe doors hang straight, with rails and shelves fixed.
  • Windows, air-conditioning, sockets and lights as in the living areas.
  • Walls and ceilings free of cracks, marks and stains.

Bathrooms

  • Taps and showers: steady pressure, and note how long hot water takes to arrive at each outlet.
  • The toilet flushes and refills, then stops running, with no leak at the base.
  • Basin, bath and shower drain freely.
  • Shower floor: pour water and watch it run to the drain, not towards the door.
  • Silicone continuous and grout complete; tap wall and floor tiles.
  • Mirror, accessories and glass screen fixed firmly; the screen door closes and seals.
  • The extract fan runs, and access panels open.

Balcony or terrace

  • Pour a bucket of water. It should run to the outlet and clear, without pooling or flowing towards the door.
  • The balustrade and handrail stay firm when pushed; glass panels are unchipped and fixings are covered.
  • The sliding door runs smoothly, locks and seals.
  • Tiles, sealant and any outdoor lights and sockets.

If a balustrade moves, a glass panel is chipped or a window restrictor does not engage, record it as a safety item. Dubai Municipality's Dubai Building Code (opens in a new tab) sets minimum requirements for the health and safety of people in and around buildings, and the developer can confirm whether an item complies.

Electrics

  • Every socket checked with the plug-in tester; note any warning light.
  • Every switch and light, including dimmers and outdoor lights.
  • The distribution board: circuits labelled. If you are comfortable doing so, press the RCD test button: the protected circuits should switch off. Reset it afterwards.
  • Extract fans, the water heater and built-in appliances all have power.

Plumbing and water heater

  • Run every tap and shower for a few minutes, then check under sinks and around the toilet for drips.
  • The water heater, if it is in the unit, heats the water.
  • The washing machine has a valve and a drain point.
  • No gurgling or slow drains, and no sewer smell from floor drains.

Air-conditioning

  • Each unit starts from its own thermostat, and air comes from every grille.
  • Set a low temperature for 15 minutes: the air from each grille should feel clearly colder than the room.
  • No dripping from indoor units or grilles, and condensate drains away.
  • No rattles, whistles or vibration; filters are in place.

Windows and doors throughout

  • Every window and door opens, closes and locks, and handles are tight.
  • Seals are continuous, with no daylight around closed frames.
  • If restrictors or child-safety locks are fitted, each one engages.

Documents, keys and meters

  • The handover certificate: the snag list attached and referenced on it, and no "no defects" box ticked while defects remain.
  • Unit details: the unit number, parking bay and area match your SPA. Under Executive Council Resolution No. (6) of 2010 (opens in a new tab), Article 13, the developer must compensate the purchaser if the actual area is less than the net area by more than 5%. A tape or laser check is indicative only; if it suggests a gap, ask for a formal measurement.
  • Keys and access: keys, access cards, parking permits and remotes counted against the handover list.
  • Paperwork: manuals and warranties for the appliances, air-conditioning and water heater, and receipts for every payment.
  • Meters: electricity, water, cooling and gas readings photographed on the day.
  • Acknowledgement: the developer's written confirmation that it has received your snag list.

Property Finder's handover guide (opens in a new tab) lists what buyers typically receive at handover, including the handover certificate, keys, access cards, parking permits, warranties and manuals, payment receipts and the title deed or proof of its application.

The checklist at a glance

AreaWhat to checkSimple test
EntranceDoor, lock, closer, intercomLock and unlock with every key
Living and bedroomsWalls, ceilings, floors, windowsTorch along the walls; tap the tiles
KitchenCabinets, worktop, sink, appliancesRun every appliance and the tap
BathroomsTaps, toilet, drains, falls, sealantRun the shower and watch where water goes
BalconyDrain, balustrade, sliding doorPour a bucket; push the rail
ElectricsSockets, switches, the boardSocket tester; RCD test button
PlumbingLeaks, hot water, drainsRun the taps, then look underneath
Air-conditioningCooling, drainage, noise15 minutes on a low setting
Windows and doorsOperation, locks, sealsOpen, close and lock each one
Documents and keysCertificate, SPA details, keys, metersCount, compare and photograph

What a DIY check cannot catch

A careful owner with this list will find most visible snags. Some defects, though, sit behind finished surfaces or need measurement:

  • Hidden moisture. A leak inside a wall or under a floor can show nothing on the surface for weeks. A thermal camera shows temperature patterns that help locate it, and a moisture meter checks for damp.
  • Insulation and air gaps. Gaps around ducts, windows and ceilings show up as temperature differences on a thermal image, not to the eye.
  • Electrical faults. A plug-in tester finds common wiring faults at sockets. Scanning the distribution board for overheating connections, and judging what a reading means, is work for a trained inspector.
  • Air-conditioning performance. Cold air is a start. Measuring the temperature of the air each unit supplies shows whether it is actually performing.
  • Area. A tape measure gives a rough idea. A laser measure and a consistent method give a more reliable indicative check against the SPA.
  • Priorities. Knowing which items are cosmetic and which will get worse helps you decide what to press for first.

That is where a professional snagging inspection earns its fee: thermal imaging and moisture readings, measured tests and a developer-ready list in Excel and PDF. See what that looks like in our sample report, or read our complete guide to snagging in Dubai.

When to bring in a professional

  • You are overseas or cannot spend three hours on site. We can attend for you: see handover representation.
  • The home is large, such as a townhouse, villa or penthouse.
  • You want a list the developer's team can work from without rewriting it.
  • You plan to let the home and want a dated record of its condition: see move-in and move-out reports.

We quote every home in writing before you book (see how our pricing works), and our snagging cost guide explains what a fair fee should include.

After you sign

Keep this checklist. For homes in jointly owned property, Dubai Law No. (6) of 2019 (opens in a new tab), Article 40, makes the developer liable for repairing or replacing defective installations for one year from handover. Use the same method to log anything that appears during that year, and read our guide to the defects liability period. This is practical guidance, not legal advice.

Frequently asked questions


Would you rather hand the checklist to someone else? Tell us your handover date, unit type and size on our booking page, or message us on WhatsApp at +971 52 585 9770 (opens in a new tab). We reply with a fixed price in writing. More guides are in Handover notes.