Skip to content

Snagging and handover inspections in Dubai

Handover, perfected.

We inspect your new home before you sign for it, and give you a snag list the developer can act on.

  • Fixed price, in writing
  • Reports in 24 to 48 hours
  • Snag list in PDF and Excel
  • Never paid by developers
Floor plan · 2-bedroom apartmentIllustration
Tested on site
  • Thermal imaging
  • Moisture
  • Water
  • Electrics
  • Air-conditioning
KD-KIT-004Major
Location
Kitchen · floor, beside the island
Trade
Tiling contractor
Action
Lift and relay the tile on a full adhesive bed.

Why it matters

Inspect before you sign.

01

Signing is acceptance.

Sign without a snag list and every defect gets harder to raise.

02

Defects hide in plain sight.

Hollow tiles, poor drainage and wiring faults don't show on a walk-through.

03

A clear list gets fixed.

Every snag is photographed, located and referenced for the repair team.

How it works

The order that protects you.

See the full process
01

Notice

Send us the handover letter and floor plan. We confirm a fixed price and a date.

02

Inspection

Two to six hours on site. Thermal imaging, moisture, water, electrics and air-conditioning tested.

03

Report

PDF and Excel within 24 hours, 48 for larger homes.

04

Re-inspect and sign

We check the repairs. You sign with the snag list attached.

Property inspectionDetailed snag record
Sample
Hollow tile
Snag IDKD-KIT-004
LocationKitchen · floor, beside the island
SeverityMajor
Responsible tradeTiling contractor
Recommended actionLift and relay the tile on a full adhesive bed.
PDF reportExcel snag list

What you receive

What's in your report.

Every snag gets an ID, a location, a photo, a severity grade and the trade that fixes it.

See our sample reports

For owners abroad

Not in Dubai for handover? We attend for you.

With your power of attorney, we attend the appointment, attach your snag list to the certificate, collect your keys and documents, and show you the home on live video.

We sign nothing for you unless you have seen it and told us to in writing.

Register interest
LiveMaster bedroom
Handover logIllustration
  • Unit keys2logged
  • Access cards2logged
  • Parking remote1logged
  • Meter readings3photographed
  • Manuals and warranties12scanned

Kept in our key safe. Released only to you or your written nominee.

Your key day, on your terms.

Send us your handover date and unit type. We reply with your fixed price in writing.