Skip to content

How it works

From handover notice to keys in hand.

The right order for a Dubai handover, and where we fit.

The sequence

  1. 01

    Notice

    Send us the developer's notice and floor plan. We confirm a price and a date.

  2. 02

    Inspection

    Two to six hours on site. Join on video, or just read the report.

    Illustration

    Tested on site

    • Thermal imaging
    • Moisture
    • Water
    • Electrics
    • Air-conditioning
  3. 03

    Report

    PDF, Excel snag list and a “Before you sign” checklist, in 24 to 48 hours.

  4. 04

    Repairs

    You send the list. The developer fixes what it accepts.

  5. 05

    Re-inspection

    We mark every item Closed, Partly fixed or Open.

  6. 06

    Sign and collect

    Sign with the snag list attached. Keys, cards and meters logged.

In month 11, we inspect again so you can claim before the developer's one-year cover ends. Practical guidance, not legal advice.

Before you sign.

  • The snag list is attached to the handover certificate and referenced on it.
  • No box says “no defects” if there are defects.
  • The developer has acknowledged the list in writing.
  • The unit number, parking bay and area match your SPA.
  • Meter readings are photographed and dated.
  • Keys, access cards, remotes and documents are counted against the handover list.
  • You keep dated photos of every open item.

Practical guidance, not legal advice.

What we need from you.

  • The developer's handover or completion notice
  • The floor plan and area page from your SPA
  • Confirmation that the developer will give us access
  • Electricity, water and cooling connected

Start with the notice.

Send us your handover notice on WhatsApp or through the booking form. We reply with a fixed price in writing.